|
|
|
EDUCATIONAL The University of Maine at Presque Isle, Folsom/Pullen Hall - 2005 Description: Remove and replace existing lab hoods, existing primary and secondary electric service, existing gas service and ventilation and heating systems for Mr. Dave St. Peter, University of Maine, Presque Isle Campus. The University of Maine at Presque Isle, Cooling Upgrade in Library - 2004-2005 Description: Remove and replace existing "DX" coil section on existing central air handler, replace with new chilled water cooling coil section, up-grade air handler with new frequency drive, controls, liner, complete and the replacement of existing condensing unit with the installation of a new Chilled Water Central System for the Library at the University of Maine, Presque Isle Campus. University of Southern Maine at Gorham, Art Department - Brickshop - Printmaking and Robie-Andrews Hall - 2004-2005 Description: Ceramic/Glazing ADA Safety Upgrades. University of Maine at Farmington, Life Safety Upgrades to Preble Hall Chemistry Laboratories - 2005 Description: Furnish and install new lab hoods, and make-up air systems for Preble Hall at the University of Maine, Farmington Campus. University of Maine at Farmington, Upgrades to Ricker Hall Geology Lab and "XRF" Room - 2005 Description: Provide new lab hoods, with ventilation and heating systems. The furnishing and installation of new lab hoods, and make-up air systems for Preble-Ricker Hall at the University of Maine, Farmington Campus. University of Maine at Augusta, Jewett Hall Heating Upgrade - Phase II - 2005 Description: Provide and install new pipe unit fan coil units; pipe cabinet heaters, remove existing fan coil units and cabinet unit heaters; repipe chill and heating water; insulation and new D.D.C. University of Maine at Augusta, Chemistry Lab Hoods Upgrade - 2005 Description: Work includes: The furnishing and installation of new lab hoods and exhaust system. The University of Maine at Fort Kent, New Residence Hall - 2003-04 Description: Provided mechanical, fire protection , and electrical design drawings and specifications for the New Residence Hall at the University of Maine at Fort Kent. The current square footage of the OFrt Kent project is 43,000 square feet. The University of Maine at Fort Kent, Blake Library - 2002-04 Description: Provided mechanical, fire protection, and electrical design drawings and specifications for the Blake Library addition (Acadia Archives) at the University of Maine at Fort Kent. The current square footage of the Fort Kent project is 7,600 and the cost was $1 million dollars. The University of Maine at Fort Kent, Cyr Hall Heating Upgrade - 2002 Description: Heating Upgrade in Cyr Hall, University of Maine at Fort Kent in Fort Kent, Maine, for Mr. Richard Bouchard, Director of Facilities Management. University of Southern Maine, Woodward Hall Water Conversion - 2001 Description: Woodward Hall conversion from steam to hot water at the Gorham Campus in Gorham, Maine, for David J Early, P.E., Executive Director for Department of Facilities Management for the University of Southern Maine. University of Southern Maine at Gorham Campus, Heating Distribution Study - 2002 Description: Technical study and report for primary high temperature and pressure hot water heating Campus Loop System at The University of Southern Maine in Gorham, Maine, for Mr. David Schurrman, Facilities Management. University of Maine at Augusta Library Piping Repair - 2002 Description: Piping Loops Replacement in Library. Design a replacement feed system the existing underslab feeds (hot water heating and chilled water piping) to exisiting four pipe fan coil units in the library. University of Maine at Augusta Jewett Hall Controls - 2002 Description: DDC Controls for Existing Boiler Room and Core Systems for Mr. Peter St. Michel, Manager of Physical Facilities, The University of Maine at Augusta. Unversity of Maine at Augusta Jewett Hall Boiler - 2001 Description: Designed Jewett Hall Boiler Replacement for Mr. Peter St. Michel, Manager of Physical Facilities, University of Maine at Augusta. University of Maine at Augusta Bangor Campus Boiler Upgrade - 2001 Description: Designed boiler replacement in three buildings (Katahdin Hall, Schoodic Hall, and Acadia Hall) at the University College at Bangor in Bangor, Maine. M.S.A.D. #22, McGraw Elementary School Fire Alarm - 2001 Description: Design of New Fire Alarm System M.S.A.D. #22, McGraw Elementary School HVAC Renovation - 2001 Description: Design drawings and professional specifications for the upgrade of heating and ventilation. M.S.A.D. #22, McGraw Elementary School Telecommunications Systems - 2001 Description: New telecommunications system for Mr. Emil Genest, Assistant Superintendent of Schools, MSAD #22. M.S.A.D. #22, Renovations to Weatherbee Elementary School - 2001 Description: Designed new heating and ventilation system for existing 1950 Classroom Wing. M.S.A.D. #22, Weatherbee Elementary School - 2001 Description: Design Toilet Renovations Fairfield High School Renovations to Kitchen Ventilation Description: Provided new air handling unit and ductwork for proper ventilation and make up air to kitchen hood. Added new Exhaust fan and ductwork for the extension of exhaust hood. Jefferson Village School, Jefferson, Maine Description: Structural Design for Partial Roof Demolition and Replacement Construction, Mechanical and Electrical Design for Ventilation and Control Renovations, and Fire Alarm System for Mr. Brent Dudley, Manager of Business Development for Siemens Building Technologies, Inc. South Portland High School & Mahoney Middle School Description: Design drawings and professional specifications for new 125 HP and 150 HP fire tube boiler. Construction management in progress. Lawrence High School Fairfield, Maine Ventilation Upgrade - 2000 Description: Designed Science Room ventilation upgrade. |
|
Last modified: 11/04/2006 |